OPL SYSTEMS for PERIMETER FIRE BARRIER SYSTEMS
|
OPL SYSTEMS for PERIMETER FIRE BARRIER SYSTEMS
FPT A 110SP seal is spray applied
Concrete Floor Assembly: 2 hour rated, 4.5 inch thick
OPL System No.
|
Max. Linear Opening Width (inch)
|
Vertical Framing
|
Exterior Wall Panels
|
Interior curtain wall surface
Framing Covers
|
Integrity Rating
(like F) (hours)
|
Insulating Rating
(like T) hours
|
Movement %,
Cycling 500 times
at 30 cpm
|
A110SP
Sealant depth (inch)
|
|
|
8
|
Steel- stud
|
steel
|
Gypsum wallboard
|
2
|
1.25
|
16.7
|
1/16 dry *
|
|
|
8
|
steel- stud
|
steel
|
Gypsum wallboard
|
2
|
1.25
|
16.7
|
1/16 dry *
|
|
|
8
|
steel- stud
|
steel
|
Min wool batt
|
2
|
0.75
|
16.7
|
1/16 dry*
|
|
|
8
|
Al
|
steel
|
Min wool batt
|
2
|
0.75
|
16.7
|
1/16 dry **
|
|
|
8
|
steel
|
steel
|
Min wool batt
|
2
|
0.25
|
16.7
|
1/16 dry *
|
|
|
8
|
Al
|
glass
|
Min wool
|
2
|
1.00
|
16.7
|
1/16 dry**
|
|
|
8
|
steel
|
glass
|
Min wool
batt
|
2
|
0.75
|
16.7
|
1/16 dry**
|
|
|
8
|
steel
|
glass
|
Gypsum wallboard
|
2
|
0.75
|
16.7
|
1/16 dry**
|
|
|
8
|
steel
|
concrete
|
optional
|
2
|
0.25
|
15
|
1/16 dry**
|
|
|
8
|
Al
|
concrete
|
Min wool
batt
|
2
|
0.25
|
15
|
1/16 dry**
|
|
|
8
|
Al
|
aluminum
|
Min wool
batt
|
2
|
0.75
|
16.7
|
1/16 dry**
|
|
|
8
|
steel
|
aluminum
|
Min wool
batt
|
2
|
0.75
|
16.7
|
1/16 dry**
|
|
|
8
|
steel
|
aluminum
|
Gypsum
wallboard
|
2
|
0.75
|
16.7
|
1/16 dry**
|
|
|
8
|
Structural framing
|
tilt- up concrete
|
-----
|
2
|
0.75
|
15
|
1/16 dry**
|
|
|
8
|
Structural framing
|
tilt- up concrete
|
------
|
2
|
0.25
|
15
|
1/16 dry**
|
|
|
8
|
Structural framing
|
tilt- up concrete
|
------
|
2
|
0.25
|
15
|
1/16 dry**
|
OPL= Omega Point Laboratories
*Apply a min. dry film thickness of 1/16 in. and overlap the material a min. 1 in. onto the adjacent curtain wall
assembly and concrete floor assembly.
** Apply a min. dry film thickness of 1/16 in. and overlap the material a min. 1/2 in. onto the adjacent curtain wall
assembly and concrete floor assembly.
# External Curtain Wall Surface: stone veneer
The Summary Table makes it possible to quickly see all the systems that use A110SP in Perimeter
Barrier systems but should not be used in place of the Systems Selection and Specification Process
Perimeter Fire Barrier System
T - Rating - 1-1/4 hr.
F - Rating - 3 hr.
L - Rating - N/A
Rated for ±16.7 movement
|
1. Concrete Floor Assembly
2. Curtain Wall Assembly
Mounting movement
Steel-Stud Framing
Steel Panels
Impaling Pins
Curtain Wall Insulation
3. Perimeter Joint Protection
= 8 in. nominal joint width
A. Packing Material
B. Fill, Void, Cavity Material (FPT A110SP)
|
|
Perimeter Fire Barrier System
T - Rating - ¾ hr.
F - Rating - 2 hr.
L - Rating - N/A
Rated for ±16.7 movement
|
1. Concrete Floor Assembly
2. Curtain Wall Assembly
A. Mounting movement
B. Steel-Stud Framing
C. Steel Panels
D. Impaling Pins
E. Curtain Wall Insulation
3. Perimeter Joint Protection
= 8 in. nominal joint width
A. Packing Material
B. Fill, Void, Cavity Material
(FPT A110SP)
C. Support Clips
D. Support Angle
|
|
Perimeter Fire Barrier System
T - Rating - 1-1/4 hr.
F - Rating - 2 hr.
L - Rating - N/A
Rated for ±16.7% movement
|
1. Concrete Floor Assembly
2. Curtain Wall Assembly
A. Mounting movement
B. Steel-Stud Framing
C. Steel Panels
D. Impaling Pins
E. Curtain Wall Insulation
F. Interior Curtain Wall Surface
3. Perimeter Joint Protection
= 8 in. nominal joint width
A. Packing Material
B. Fill, Void, Cavity Material
(FPT A110SP)
C. Support Clips
D. Support Angle
|
|
Perimeter Fire Barrier System
T - Rating - 1/4 hr.
F - Rating - 2 hr.
L - Rating - N/A
Rated for ±16.7% movement
|
1. Concrete Floor Assembly
2. Curtain Wall Assembly
A. Mounting Attachment
B. Steel-Stud Framing
C. Steel Panels
D. Impaling Pins
E. Curtain Wall Insulation
F. Framing Covers
3. Perimeter Joint Protection
= 8 in. nominal joint width
A. Packing Material
B. Fill, Void, Cavity Material
(FPT A110SP)
C. Support Clips
D. Support Angle
|
|
Perimeter Fire Barrier System
T - Rating - 1 hr.
F - Rating - 2 hr.
L - Rating - N/A
Rated for ±15% movement
|
1. Concrete Floor Assembly
2. Curtain Wall Assembly
A. Mounting Attachment
B. Steel-Stud Framing
C. Glass Panels
D. Impaling Pins
E. Curtain Wall Insulation
F. Framing Covers
3. Perimeter Joint Protection
= 8 in. nominal joint width
A. Packing Material
B. Fill, Void, Cavity Material
(FPT A110SP)
C. Support Clips
|
|
Perimeter Fire Barrier System
T - Rating - 1/4 hr.
F - Rating - 2 hr.
L - Rating - N/A
Rated for ± 15% movement
|
1. Concrete Floor Assembly
2. Curtain Wall Assembly
A. Panel Mounting Attachment
B. Structural Framing
C. Tilt-up Panels
D. Concrete Panel Joint
E. Curtain Wall Insulation
F. Impaling Pins
3. Perimeter Joint Protection
= 8 in. nominal joint width
A. Packing Material
B. Fill, Void, Cavity Material
(FPT A110SP)
C. Support Clips
D. Support Angle
|
|
Perimeter Fire Barrier System
T - Rating - 1/4 hr.
F - Rating - 2 hr.
L - Rating - N/A
Rated for ± 15% movement
|
1. Concrete Floor Assembly
2. Curtain Wall Assembly
A. Mounting Attachment
B. Steel-Stud Framing
C. Concrete
D. Impaling Pins
E. Curtain Wall Insulation
F. Concrete Panel Joint
G. Framing Covers
3. Perimeter Joint Protection
= 8 in. nominal joint width
A. Packing Material
B. Fill, Void, Cavity Material
(FPT A110SP)
C. Support Clips
D. Support Angle
|
|
Perimeter Fire Barrier System
T - Rating - 1/4 hr.
F - Rating - 2 hr.
L - Rating - N/A
Rated for ± 15% movement
|
1. Concrete Floor Assembly
2. Curtain Wall Assembly
A. Mounting Attachment
B. Aluminum Framing
C. Concrete Panels
D. Impaling Pins
E. Curtain Wall Insulation
F. Concrete Panel Joint
G. Framing Covers
3. Perimeter Joint Protection
= 8 in. nominal joint width
A. Packing Material
B. Fill, Void, Cavity Material
(FPT A110SP)
C. Support Clips
D. Support Angle
|
|
Perimeter Fire Barrier System
T - Rating - 3/4 hr.
F - Rating - 2 hr.
L - Rating - N/A
Rated for ±16.7% movement
|
1. Concrete Floor Assembly
2. Curtain Wall Assembly
A. Mounting Attachment
B. Aluminum Framing
C. Steel Panels
D. Impaling Pins
E. Curtain Wall Insulation
F. Concrete Panel Joint
G. Framing Covers
3. Perimeter Joint Protection
= 8 in. nominal joint width
A. Packing Material
B. Fill, Void, Cavity Material
(FPT A110SP)
C. Support Clips
D. Support Angle
|
|
Perimeter Fire Barrier System
T - Rating - 3/4 hr.
F - Rating - 2 hr.
L - Rating - N/A
Rated for ±16.7% movement
|
1. Concrete Floor Assembly
2. Curtain Wall Assembly
A. Mounting Attachment
B. Aluminum Framing
C. Aluminum Panels
D. Impaling Pins
E. Curtain Wall Insulation
F. Framing cover
3. Perimeter Joint Protection
= 8 in. nominal joint width
A. Packing Material
B. Fill, Void, Cavity Material
(FPT A110SP)
C. Support Clips
D. Support Angle
|
|
Perimeter Fire Barrier System
T - Rating - 3/4 hr.
F - Rating - 2 hr.
L - Rating - N/A
Rated for ±16.7% movement
|
1. Concrete Floor Assembly
2. Curtain Wall Assembly
A. Mounting Attachment
B. Steel-Stud Framing
C. Glass Panels
D. Impaling Pins
E. Curtain Wall Insulation
F. Framing cover
3. Perimeter Joint Protection
= 8 in. nominal joint width
A. Packing Material
B. Fill, Void, Cavity Material
(FPT A110SP)
C. Support Clips
D. Support Angle
|
|
Perimeter Fire Barrier System
T - Rating - 3/4 hr.
F - Rating - 2 hr.
L - Rating - N/A
Rated for ±16.7% movement
|
1. Concrete Floor Assembly
2. Curtain Wall Assembly
A. Mounting Attachment
B. Steel-Stud Framing
C. Aluminum Panels
D. Impaling Pins
E. Curtain Wall Insulation
F. Framing cover
3. Perimeter Joint Protection
= 8 in. nominal joint width
A. Packing Material
B. Fill, Void, Cavity Material
(FPT A110SP)
C. Support Clips
D. Support Angle
|
|
Perimeter Fire Barrier System
T - Rating - 3/4 hr.
F - Rating - 2 hr.
L - Rating - N/A
Rated for ±16.7% movement
|
1. Concrete Floor Assembly
2. Curtain Wall Assembly
A. Mounting Attachment
B. Steel-Stud Framing
C. Glass Panels
D. Impaling Pins
E. Curtain Wall Insulation
F. Framing cover
3. Perimeter Joint Protection
= 8 in. nominal joint width
A. Packing Material
B. Fill, Void, Cavity Material
(FPT A110SP)
C. Support Clips
D. Support Angle
|
|
Perimeter Fire Barrier System
T - Rating - 3/4 hr.
F - Rating - 2 hr.
L - Rating - N/A
Rated for ±16.7%
movement
|
1. Concrete Floor Assembly
2. Curtain Wall Assembly
A. Mounting Attachment
B. Steel-Stud Framing
C. Aluminum Panels
D. Interior Curtain Wall Surface
E. Curtain Wall Insulation
F. Impaling Pins
3. Perimeter Joint Protection
= 8 in. nominal joint width
A. Packing Material
B. Fill, Void, Cavity Material
(FPT A110SP)
C. Support Clips
D. Support Angle
|
|
Perimeter Fire Barrier System
T - Rating - 1/4 hr.
F - Rating - 2 hr.
L - Rating - N/A
Rated for ±15% movement
|
1. Concrete Floor Assembly
2. Curtain Wall Assembly
A . Panel Mounting Attachment
B. Structural Framing
C. Tilt-up Panels
D. Concrete Panel Joint
E. Curtain Wall Insulation
F. Impaling Pins
3. Perimeter Joint Protection
= 8 in. nominal joint width
A. Packing Material
B. Fill, Void, Cavity Material
(FPT A110SP)
C. Support Clips
D. Support Angle
|
|
Perimeter Fire Barrier System
T - Rating - 1/4 hr.
F - Rating - 2 hr.
L - Rating - N/A
Rated for ±15% movement
|
1. Concrete Floor Assembly
2. Curtain Wall Assembly
A. Panel Mounting Attachment
B. Structural Framing
C. Tilt-up Panels
D. Concrete Panel Joint
E. Curtain Wall Insulation
F. Impaling Pins
3. Perimeter Joint Protection
= 8 in. nominal joint width
A. Packing Material
B. Fill, Void, Cavity Material
FPT A110SP)
C. Support Clips
D. Support Angle
|
|
Copyright © 2008 Fire Protection Technologies, Inc. All rights reserved
|